.......the roof. The guys were able to put the decking on the trusses and got the tar paper put on the front section of the roof. The back part of the roof still needs some decking and to be papered, which was readily apparent during a downpour this weekend. They finished the front wall up the trusses on the front.
|
House Site 5/22/2016 |
The significant other got the mesh over the J Channels covered with concrete. We also, made decisions on shingles, stone, and vinyl for covering the outside. So we can get those things to the house site before the bridge closes.
|
Staged Materials for Bridge Replacement |
The power company came and put the lines up, so now the guys have electricity instead of having to use a generator. Makes things a lot quieter at the house site. Even the turkeys have returned with the quiet.
|
Turkey Under the Power lines |
We have new Tree Swallow families starting life in our nest boxes.
|
Tree Swallow Babies in Jeter Box |
|
Tree Swallow Babies in Machine Barn Box |
Hope you have a great week and the only vultures you have to deal with are those up in old dead trees.
|
Sunning Black Vultures in Northwest Scag |
No comments:
Post a Comment