Sunday, March 27, 2016

Big Doings

House Site 3/27/2016
We have a loft room.  That means we are another step closer to getting a roof.

This week started by putting in some beams and the sub-flooring for the loft room.
Great Room Beams in place

Loft Room Sub-Flooring in Place
 The plywood decking was placed and by Thursday another boom truck was on the job site to place the walls for the loft
Boom Truck Moving Panel into Place
It is a heck of a view from the loft but unfortunately it will be covered up by roof.  However, before that happens, someone enjoys hanging out up there.

View From Loft
View Vulture Setting in Loft

The hopefully soon to be resident jack-legs (me and the significant other) got the last of the back wall rubberized.  Also, finished the drain system and covered it with gravel.  We like to have some skin in the game, plus we are cheap in some ways. ;-)

Here is to hoping that the roof trusses start going in next week.

No comments: